This is why PVC needs to acclimatize


PVC is a type of material that reacts to temperature differences. If you skip the acclimatization, there is a good chance that your floor will shrink or expand after installation. This can then lead to warping or even damage to your floor. Something that you would rather prevent than have to deal with afterwards. The answer to the question 'Does PVC need to acclimatize?' is therefore always yes! This gives the PVC the chance to adapt to the new environment.

Think of acclimatisation as a first introduction between your floor and the temperature and humidity of the room in which it is to be laid: not a step you want to miss! This ultimately ensures an optimal installation and therefore a longer lifespan of your floor.

How long does a PVC floor need to acclimatize?

Let's get straight to the point: most PVC floors need to acclimatise for around 48 hours. This means that you need to let your new PVC floor get used to your home for the first 2 days before you start installing it. It is also important that PVC is acclimatised in the room where it will actually be installed. Tip: There are always exceptions. Therefore, always consult instructions from our sellers to ensure that you allow your floor to acclimatise long enough.

Acclimatizing a PVC floor? A handy step-by-step plan

Do you want to be well prepared for acclimatization? With this step-by-step plan you can be sure that your PVC floor gets the optimal time to get used to it.

  1. Check the temperature . The right room conditions are essential. Make sure the temperature in the room where the floor is to be laid is between 18°C ​​and 20°C.
  2. Lay the packages flat . By laying the packages flat, you ensure that each package can optimally take up the space. Also create sufficient space between the packages, so that the air can circulate.
  3. Wait 48-72 hours . Give the packs at least 48 hours to acclimatize to the new space. In new homes, it is advisable to let the floor acclimatize for 72 hours.
  4. Keep checking the temperature . Make sure the temperature remains constant during both acclimatization and installation. It is important that it is always around 18°C ​​and 20°C. Consistency is the key to success.